ms·1974년 3월 1일
Cost Minimizing Single Sampling Plans with AIQL and AOQL Constraints
Sedat Sami Ercan, M. Zia Hassan, Ajva Taulananda
인용
19
피인용
0.0
FWCI
1
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제설비 유지보수 최적화 · 생산·최적화
01Abstract
This paper investigates and formulates the relationships among average incoming quality limit (AIQL), production process quality level and average fraction defective after production process for a single-stage manufacturing connected-unit situation. Cost components of the system are identified. In order to derive minimum cost single sampling plans where inspection is by attribute, a mathematical model is developed and plans are obtained using discrete optimization for the total expected loss function subject to AIQL and AOQL equality constraints.
02연구 흐름
불러오는 중…
03비슷한 논문
- Effect of Risk Aversion on Single Sample Attribute Inspection Plans
- A Bayesian Algorithm for Determining Optimal Single Sample Acceptance Plans for Product Attributes
- Optimal Screening Plans for Nonserial Production Systems
- A Markov Quality Control Process Subject to Partial Observation
- Multiattribute Bayesian Acceptance Sampling Plans Under Nondestructive Inspection
- Models for Measuring and Accounting for Cost of Conformance Quality
- Interactive Process Quality Improvement
- The Analysis of a Simple Class of Multistage Inspection Plans
- Development and Evaluation of Surveillance Sampling Plans
- The Optimum Reject Allowance Problem
04이후 연구
05선행 연구
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 20(7) · 1112–1121
- 토픽Advanced Statistical Process Monitoring · Statistics, Probability and Uncertainty
- DOI10.1287/mnsc.20.7.1112
- 저자Sedat Sami Ercan, M. Zia Hassan, Ajva Taulananda