ms·1974년 3월 1일
Cost Minimizing Single Sampling Plans with AIQL and AOQL Constraints
Sedat Sami Ercan, M. Zia Hassan, Ajva Taulananda
Management Science
18
피인용
0.0
FWCI
1
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제설비 유지보수 최적화 · 생산·최적화
01Abstract
This paper investigates and formulates the relationships among average incoming quality limit (AIQL), production process quality level and average fraction defective after production process for a single-stage manufacturing connected-unit situation. Cost components of the system are identified. In order to derive minimum cost single sampling plans where inspection is by attribute, a mathematical model is developed and plans are obtained using discrete optimization for the total expected loss function subject to AIQL and AOQL equality constraints.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 20(7) · 1112–1121
- 토픽Advanced Statistical Process Monitoring · Statistics, Probability and Uncertainty
- DOI10.1287/mnsc.20.7.1112
- 저자Sedat Sami Ercan, M. Zia Hassan, Ajva Taulananda