ms·1973년 11월 1일
A Long-Range Selection and Timing Analysis System for Facility Location: Implementation
Management Science
9
피인용
2.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제시설 입지와 물류 최적화 · 생산·최적화
01Abstract
This paper describes the application of a mixed-integer program to the problem of providing strategic decisions for the selection and timing of a set of proposed facilities to serve distinct geographic regions. Solutions to this selection-timing process are obtained by the system presented so as to maximize the ratio of total net revenues to total assets. In addition, a series of optimal integer solutions to a large-scale problem is included with discussion and analysis.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 20(3) · 261–273
- 토픽Advanced Manufacturing and Logistics Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.20.3.261
- 저자Carl F. Meyer