IS Atlas
ms·1971년 9월 1일

Maximal Flow in a Multi-Terminal Network with Any One Arc Subject to Failure

P. J. Doulliez, M. R. Rao

Management Science

11
피인용
5.9
FWCI
1
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
01Abstract

A multi-terminal network consists of several demand nodes connected to a common source node through several intermediate nodes. The requirements at the demand nodes are nondecreasing functions of time. It is required to find the maximum time up to which all demands can be satisfied. In this paper two methods are given for solving the problem when the arc capacities are specified. The same problem is also considered for the case in which any one arc of the network may fail, that is, any one arc may assume a specified lower capacity for that arc. An efficient method for solving this problem is also presented.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보