IS Atlas
ms·1967년 3월 1일

Minimum-Cost Checking Using Imperfect Information

Stephen M. Pollock

Management Science

17
피인용
0.5
FWCI
1
IS/마케팅/OM 탑저널 피인용
6
IS/마케팅/OM 탑저널 참고문헌
01Abstract

An event takes place at time t, a discrete random variable with known probability function. At unit intervals of time, a measurement x is observed which yields information about the event; x is a random variable, with a known probability density function being dependent upon whether or not the event has yet occurred. After each observation, a decision is made that the event has or has not yet occurred. The latter decision implies waiting for the next measurement. The former decision, if correct, ends the procedure. If incorrect, this fact is incorporated, and the procedure continues. A decision cost structure is assumed that assigns: (1) a fixed (false alarm) cost to deciding the event has occurred when, in fact, it has not; (2) a (time late) cost proportional to the time between the occurrence of the event and the decision that it has occurred. The minimum-expected-cost decision strategy and the minimum cost thus obtained are derived by means of dynamic programming.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보