- 주제용량 계획 및 투자 · 생산·최적화
The combination of demand uncertainty and a lead time for adding capacity creates the risk of capacity shortage during the lead time. We formulate a model of capacity expansion for uncertain exponential demand growth and deterministic expansion lead times when there is an obligation to provide a specified level of service. The service level, defined in terms of the ratio of expected lead-time shortage to installed capacity, is guaranteed by timing each expansion to begin when demand reaches a fixed proportion of the capacity position. Under this timing rule, the optimal facilities to install can be determined by solving an equivalent deterministic problem without lead times. Numerical results show the effects of the demand parameters and lead-time length on the expansion timing. The interaction of timing with expansion size is explored for the case when continuous facility sizes are available with economies of scale.
불러오는 중…
- On Optimal Expediting Policy for Supply Systems with Uncertain Lead‐Times
- Sequencing Capacity Expansion Projects in Continuous Time
- Determining Safety Stock in the Presence of Stochastic Lead Time and Demand
- Note—A Note on the Deterministic Capacity Problem
- Stochastic Capacity Models
- A Coordinated Production Planning Model with Capacity Expansion and Inventory Management
- Robust Capacity Planning Under Uncertainty
- A Capacitated Multi‐echelon Inventory Placement Model under Lead Time Constraints
- Capacity Expansion with Imports and Inventories
- Planning Electric Power Systems Under Demand Uncertainty with Different Technology Lead Times
15 / 27편
- Turnpike Results for Single Location Capacity Expansion
- Optimal Capacity Expansion Over an Infinite Horizon
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 50(6) · 740–748
- 토픽Capital Investment and Risk Analysis · Finance
- DOI10.1287/mnsc.1030.0187
- 저자Sarah M. Ryan