An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units
Jeyaveerasingam George Shanthikumar, C. Tien
인용
- 주제생산 계획과 일정 · 생산·최적화
An important aspect of the efficient design of an automatic transfer line is the ability to understand and predict the effects of the system parameters such as the size of the intermediate buffer storage space, the cycle times, failure times, repair times, and scrap rate, on the production rate of the transfer line. In this paper we develop an efficient algorithm to compute the production rate of a two-stage transfer line for different system parameters. The algorithm is developed assuming that the failure and repair times are geometrically distributed and that the units may be scrapped with a certain probability when the machine processing it fails. Using this algorithm, extensive numerical results are obtained. Based on these numerical results, the behavior of the transfer line is discussed and some interesting observations are reported which would be useful in the design of automatic transform lines.
불러오는 중…
- A New Approach to Determine Parameter Sensitivities of Transfer Lines
- Production Lines and Internal Storage—A Review
- Recursion Models for Describing and Managing the Transient Flow of Materials in Generalized Flowlines
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines
- Parallel Line Assignment Problems
- On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- The Output Process of Serial Production Lines of General Machines with Finite Buffers
- Assembly Line Balancing with Processing Alternatives: An Application
- Notes: Toward Characterizing the Optimal Allocation of Storage Space in Production Line Systems with Variable Processing Times
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- A New Approach to Determine Parameter Sensitivities of Transfer Lines
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 29(9) · 1069–1086
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.29.9.1069
- 저자Jeyaveerasingam George Shanthikumar, C. Tien