7
피인용
2.3
FWCI
0
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Shuttle cars form a part of the standard equipment employed by the mining industry in the transportation of coal when using the room-and-piller method for extracting coal from underground seams. These cars are subject to frequent failure, so the problem of assigning shuttle cars to sections of the mine is considered in this paper, with the objective of maximizing expected output. A particularly simple solution is found that could be used readily by any mine foreman.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time Periods
- Dynamic Job Assignment for Railway Personnel
- An Optimization Approach to Freight Car Allocation Under Time-Mileage Per Diem Rental Rates
- Parallel Line Assignment Problems
- Lane’s Algorithm Revisited
- Optimal Dispatching of a Finite Capacity Shuttle
- A Branch-First, Cut-Second Approach for Locomotive Assignment
- Car Pool Systems in Railroad Transportation: Mathematical Models
- The Truck Dispatching Problem
- A Model for the Optimal Programming of Railway Freight Train Movements
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
06서지 정보
- 저널Management Science · 17(9) · 652–655
- 토픽Advanced Manufacturing and Logistics Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.17.9.652
- 저자Gary H. Reynolds