ms·1977년 5월 1일
Electric Power System Planning with Explicit Stochastic Reserves Constraint
Charles R. Scherer, Leland Joe
Management Science
23
피인용
3.9
FWCI
0
IS/마케팅/OM 탑저널 피인용
11
IS/마케팅/OM 탑저널 참고문헌
- 주제녹색기술 정책 · 생산·최적화
01Abstract
The problem of optimal planning of an electric power system is formulated as a cost minimizing mixed-integer mathematical program. The model emphasizes system reliability, requiring reserve generating capacity such that a Loss of Load Probability criterion of one day in ten years is met. Integer variables are used in the model to express system reliability explicitly as a constraint on the system model. Results are given for several plant outage rates and demand levels. The results show that the reliability and “rule-of-thumb” approaches to system reserve planning can yield substantially different optimal system costs and configurations.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 23(9) · 978–985
- 토픽Power System Reliability and Maintenance · Safety, Risk, Reliability and Quality
- DOI10.1287/mnsc.23.9.978
- 저자Charles R. Scherer, Leland Joe