The Manufacturer's Incentive to Reduce Lead Times
Santiago Kraiselburd, Richard Pibernik, Ananth Raman
Production and Operations Management
인용
- 주제공급망 정보 공유 · 공급망관리
Although, ceteris paribus, reducing lead times may be desirable from an overall system perspective, an upstream party (e.g., a manufacturer) may have strong disincentives to offer shorter lead times, even if this came at no cost. We consider a setting in which the downstream party has the ability to exert a costly effort to increase demand (e.g., through sales promotions, advertising, etc.) during the selling season, and compare two situations: one where there is zero lead time (i.e., all demand can be satisfied after observing the demand realization), and one where orders need to be made before demand is realized. We identify two interacting effects that may inhibit shorter lead times. A so‐called “safety stock effect” can be observed when a lower risk of stocking out under short lead times induces the downstream party to alter her order quantity. A second effect, termed as “effort effect,” arises if shorter lead times impact the downstream party's optimal sales effort, and, as a consequence, lead to different order quantities. We provide a formal characterization of both effects, insight into how these effects interact, and show under which conditions the manufacturer has an incentive to offer shorter lead times.
불러오는 중…
- Lot Sizes, Lead Times and In-Process Inventories
- Quoting Customer Lead Times
- Customer-Order Information, Leadtimes, and Inventories
- Inventory Control when the Lead‐time Changes
- On Optimal Expediting Policy for Supply Systems with Uncertain Lead‐Times
- The Effect of Reducing Leadtime on Inventory Levels-Simulation Analysis
- The Effect of Leadtime Uncertainty in a Simple Stochastic Inventory Model
- A Dynamic Inventory Model with Stochastic Lead Times
- Ordering, Pricing, and Lead‐Time Quotation Under Lead‐Time and Demand Uncertainty
- Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing
15 / 18편
- Supply Chain Coordination with Revenue-Sharing Contracts: Strengths and Limitations
- The Allocation of Inventory Risk in a Supply Chain: Push, Pull, and Advance-Purchase Discount Contracts
- Quick Response in Manufacturer-Retailer Channels
- Supply Chain Coordination Under Channel Rebates with Sales Effort Effects
- Efficient Supply Contracts for Fashion Goods with Forecast Updating and Two Production Modes
- Coordinating Contracts for Decentralized Supply Chains with Retailer Promotional Effort
- Quick Response and Retailer Effort
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Production and Operations Management · 20(5) · 639–653
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1111/j.1937-5956.2010.01192.x
- 저자Santiago Kraiselburd, Richard Pibernik, Ananth Raman