IS Atlas
pom·2022년 9월 9일

Genuine and sustained POM mastery from linear POM to POM system symphonies

Peter W. Robertson, Martin K. Starr

Production and Operations Management

4
피인용
0.8
FWCI
1
IS/마케팅/OM 탑저널 피인용
15
IS/마케팅/OM 탑저널 참고문헌
01Abstract

A dramatically changing business landscape characterized by volatility and uncertainty (which in turn are driven by unpredictable alterations of conditions by such factors as geopolitical events, climate changes, disasters—natural and human causes, reduction in food, potable water, and critical materials supply along with environmental contamination), has created a situation whereby a rethink of Production and Operations Management (POM) strategies and practices is considered timely and appropriate. Against a backdrop of current POM strengths and weaknesses, and expected POM futures, a response path for POM adoption to deal with such uncertainties and risks is proposed and described in some detail. This involves the treatment of POM as a more interconnected and integrated system than has hitherto been the case. Such an interconnected approach is described as a POM symphony where all key players would be playing from the same script and the POM leader must serve as a coach‐coordinator, that is, the symphony's conductor.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보