IS Atlas
pom·2023년 1월 5일·주제 밖

Long‐term service agreement in electricity supply chain with renewable energy penetration

Panos Kouvelis, Hirofumi Matsuo, Yixuan Xiao, Quan Yuan

Production and Operations Management

10
피인용
1.3
FWCI
2
IS/마케팅/OM 탑저널 피인용
31
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We study a long‐term service agreement (LTSA) between an original equipment manufacturer (OEM) of a conventional power generator and a utility firm in the electricity supply chain. The OEM offers the LTSA to the utility firm, which specifies the service fee and the maintenance interval. The utility firm dynamically chooses among different resources (conventional, renewable, or emergency) to meet energy demand. An LTSA contracts on a generator's long‐term production schedule (i.e., the usage time and number of starts). We first characterize that the conventional generator's optimal operating mode (i.e., on or off) follows a two‐threshold policy, which shows a hysteresis phenomenon. Then, the optimal production from different resources can be obtained by minimizing the utility firm's cost of the current period. We prove that the OEM's optimal LTSA design on the maintenance interval and service fee can be solved sequentially, and capture the trade‐off between the service margin and the usage of conventional generator. Our numerical results show that the utility firm starts the conventional generator less often as the maintenance service fee of a start increases and the minimum conventional output decreases. The OEM has incentives to reduce the minimum output to make the conventional generator more flexible, but such improvement may not benefit the utility firm. Finally, increasing renewable penetration leads to more frequent cycling of the conventional generator and less conventional output. With more renewable generation and less conventional and emergency generation, higher renewable penetration reduces the utility firm's cost, the OEM's profit, and the total emission.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보