Self-Control in the Face of Multiple Projects
Manufacturing & Service Operations Management
인용
- 주제시간간 선택 · 의사결정분석
- 방법
- 현상
Problem definition: We study how people with present bias make choices when they face multiple projects. Each project consists of a starting and a finishing stage, both requiring costly effort to complete but yield rewards only after project completion. Methodology/results: We derive people’s perception-perfect strategies for project scheduling. Naifs may start a project, but never finish it. They may multitask; that is, start a new project before finishing an old project. They may not prioritize projects by NPV. Sophisticates do not start a project but not finish it. However, like naifs, they may multitask and not prioritize projects by NPV. What happens if people can choose the cost structure endogenously? If people multitask when the cost structure is exogenously given, then when the cost structure can be chosen by them, naifs delay the costs to the finishing stages as much as possible, resulting in either multitasking or procrastination. If, in addition, the project with a higher NPV has a lower total cost, then naifs prioritize projects by NPV. Sophisticates, however, may not always delay the costs to finishing stages when given a choice because delaying the costs may lead to multitasking, which decreases the utility and they, unlike naifs, are fully aware of. Therefore, under endogenous cost structure, sophisticates may or may not multitask or prioritize projects by NPV. Managerial implications: Enhancing individuals’ awareness of their present bias makes them less likely to behave sub-optimally. Increasing load can also, though not always, alleviate procrastination and reduce the possibility of multitasking and not prioritizing projects based on NPV. When project portfolios are predetermined, increasing awareness of present bias always improves people’s long-run utility. However, when project portfolios are selected endogenously, sophistication does not always pay because naifs may either complete more projects or complete a more profitable project than sophisticates. Funding: P. Yu was supported by the National Natural Science Foundation of China [Grants 72371038 and 72033003]. Supplemental Material: The online appendix is available at https://doi.org/10.1287/msom.2025.0426 .
불러오는 중…
- Asymmetric Naïveté: Beliefs About Self-Control
- Human Decision Making in Dynamic Resource Allocation
- Optimal Time-Inconsistent Beliefs: Misplanning, Procrastination, and Commitment
- Sunk Cost Bias and Time Inconsistency: A Strategic Analysis of Pricing Decisions
- Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty
- Motivated Procrastination
- Project Portfolio Selection with Strategic Buckets—The Role of Naïve Diversification
- Managerial Mental Accounting and Downstream Project Decisions
- The Value of Nothing: Asymmetric Attention to Opportunity Costs Drives Intertemporal Decision Making
- Constructing New Product Development Portfolios with Internal and External Projects
아직 이 논문을 인용한 탑저널 논문이 없습니다.
15 / 42편
- Impact of Workload on Service Time and Patient Safety: An Econometric Analysis of Hospital Operations
- Discretionary Task Ordering: Queue Management in Radiological Services
- Does Multitasking Improve Performance? Evidence from the Emergency Department
- Managing Cost Salience and Procrastination in Projects: Compensation and Team Composition
- Implications of Hyperbolic Discounting for Optimal Pricing and Scheduling of Unpleasant Services That Generate Future Benefits
- Task Selection and Workload: A Focus on Completing Easy Tasks Hurts Performance
- OM Forum—People-Centric Operations: Achievements and Future Research Directions
- Multitasking, Multiarmed Bandits, and the Italian Judiciary
- Collaboration, Interruptions, and Changeover Times: Workflow Model and Empirical Study of Hospitalist Charting
- Design of Long‐Term Conditional Cash Transfer Program to Encourage Healthy Habits
- Defining Problems Fast and Slow: The U‐shaped Effect of Problem Definition Time on Project Duration
- Scheduling with present bias
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Manufacturing & Service Operations Management · 27(5) · 1449–1463
- 토픽Complex Systems and Decision Making · Management Science and Operations Research
- DOI10.1287/msom.2025.0426
- 저자Qing Li, Peiwen Yu