IS Atlas
ms·1974년 3월 1일

General Planning Horizons for Production Smoothing with Deterministic Demands

Howard C. Kunreuther, Thomas E. Morton

Management Science

인용
43
피인용
5.3
FWCI
7
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
01Abstract

In Part I of this paper, we developed an algorithm for finding planning horizons for the deterministic production smoothing problem when all demand was required to be met from regular production, under rather general assumptions for the production, production smoothing, and holding cost functions. Here, in Part II, we develop analogous planning horizons when the model is extended to include such factors as overtime, lost sales, simple subcontracting, undertime, and backlogging. Part II depends heavily on Part I. To avoid unnecessary tedium, all cost functions will be assumed to be stationary in Part II. Overtime, undertime, holding, and backlogging will be assumed to be convex increasing, all other costs linear and proportional. However, it is not difficult to see that the techniques of Part I can be utilized directly to cover more general cost functions. Part II concludes with a discussion of the application of our general approach to actual data.

02연구 흐름

불러오는 중…

03비슷한 논문
04이후 연구
05선행 연구
06서지 정보