- 주제생산 계획과 일정 · 생산·최적화
This paper deals with the planning horizon issues of the problem of finding the optimal production schedule over a [0, T] period, for a product having: (1) deterministic demand, (2) strictly convex production costs, and (3) linear holding and back-logging costs. A set of solutions defined as extrapolations is defined, and a property of nonintersection of extrapolations is proved. Using this property uniqueness and planning horizon theorems are proved. It is shown that the reason for the planning horizons is the jump (discontinuity) in the derivative of the inventory cost function when inventory is zero. In addition, the paper deals with the following question: What kinds of changes (variations) in demand may occur such that the optimal solution (production schedule) on some time interval will remain unchanged? This question is associated with the following one: What information is needed about demand in order that the optimal solution on some time interval may be found?
불러오는 중…
- Further Results on Planning Horizons in the Production Smoothing Problem
- Using Linear Programming to Derive Planning Horizons for a Production Smoothing Problem
- Planning Horizons for Production Smoothing with Deterministic Demands
- Infinite Horizon Production Planning in Time-Varying Systems with Convex Production and Inventory Costs
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
- General Planning Horizons for Production Smoothing with Deterministic Demands
- Stochastic Horizons for the Aggregate Planning Problem
- Turnpike Horizons for Production Planning
- A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs
- Discussion—A Note on the Asymptotic Behavior of an Optimal Procurement Policy
- Turnpike Horizons for Production Planning
- Nobel laureates’ contributions to and impacts on operations management
- Discrete Optimal Control of Production Plans
- Further Results on Planning Horizons in the Production Smoothing Problem
- Note—On “Further Results on Planning Horizons in the Production Smoothing Problem”
- Some Generalizations of an Inventory Planning Horizon Theorem
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
- Production Planning with Convex Costs: A Parametric Study
- Sequential Production Planning Over Time at Minimum Cost
- Least d-Majorized Network Flows with Inventory and Statistical Applications
- On Production Smoothing
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 20(3) · 319–330
- 토픽Economic theories and models · Economics and Econometrics
- DOI10.1287/mnsc.20.3.319
- 저자Zvi Lieber