Optimality of the Symmetric Workload Allocation in a Single-Server Flow Line System
인용
- 주제작업장 일정 최적화 · 생산·최적화
This paper provides a proof of the symmetrical allocation property (SAP), conjectured in an earlier work on the workload allocation problem for a manufacturing flow line system. The system consists of N single-Erlang servers in series having a common interstation buffer capacity. SAP says a symmetric workload allocation exists among the optimal solutions. We first show the reciprocal of the throughput is increasing and jointly convex, not component-wisely, in workloads. Then we apply the line reversibility property to obtain an alternative optimal allocation symmetric for any optimal workload allocation that is asymmetric. A sufficient condition for SAP to hold is also given, which relaxes the hypothesizing assumptions on the service-time distribution and interstation buffer capacities.
불러오는 중…
- Optimal Workload Allocation in Open Networks of Multiserver Queues
- On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times
- Optimal Server Allocation in a System of Multi-Server Stations
- The Discrete Resource Allocation Problem in Flow Lines
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines
- Flexible Servers in Understaffed Tandem Lines
- Notes: Toward Characterizing the Optimal Allocation of Storage Space in Production Line Systems with Variable Processing Times
- Note: On the Efficiency of Imbalance in Multi-Facility Multi-Server Service Systems
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
- Flexibly Serving A Finite Number of Heterogeneous Jobs in A Tandem System
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 저널Management Science · 45(3) · 449–451
- 토픽Advanced Queuing Theory Analysis · Management Information Systems
- DOI10.1287/mnsc.45.3.449
- 저자Hyoung-Tae Kim, Sungsoo Park