Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines

Ramesh Bollapragada, Uday S. Rao

Management Science

20
피인용
1.1
FWCI
0
IS/마케팅/OM 탑저널 피인용
22
IS/마케팅/OM 탑저널 참고문헌
01Abstract

This paper focuses on simultaneous resource allocation, lot-sizing, and scheduling in a multimachine, deterministic ELSP environment. We consider the problem of apportioning item production to distinct manufacturing lines with different costs and capabilities (production rates). The objective is to minimize the long-run average production, setup, inventory, and shortage penalty costs (due to lost sales). Restricting attention to rotation schedules, we develop a concave minimization model of the problem, generate heuristic solutions and a lower bound on the cost of any feasible solution. Computational experiments indicate that our heuristic solution is within a few percent of the lower bound. We also investigate sensitivity of costs to model parameters, and illustrate how our model may be used to determine target values for equipment utilization.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보