Maximizing the Effectiveness of a Preventive Maintenance System: An Adaptive Modeling Approach
Mohan Gopalakrishnan, Sanjay Laxman Ahire, David M. Miller
인용
- 주제작업장 일정 최적화 · 생산·최적화
The dynamic nature of an operating environment, such as machine utilization and breakdown frequency results in changing preventive maintenance (PM) needs for manufacturing equipment. In this paper, we present an approach to generate an adaptive PM schedule which maximizes the net savings from PM subject to workforce constraints. The approach consists of two components: (a) task prioritization based on a multi-logit regression model for each type of PM task, and (b) task rescheduling based on a binary integer programming (BIP) model with constraints on single-skilled and multi-skilled workforce availability. The task prioritization component develops a multi-logit regression for machine failure probability associated with each type of PM task at the beginning of the year, using historical data on machine utilization, PM, and machine breakdowns. At the start of each PM time-bucket (e.g., a month), we use the updated machine failure probability for each candidate PM task to compute its current contribution to net PM savings, which indicates its current priority. The task rescheduling BIP model incorporates the priorities in selecting tasks for the current bucket to maximize PM effectiveness subject to workforce availability, yielding an adaptive and effective PM schedule for each time-bucket of the master PM schedule. We examine the effect of using multi-skilled workforce on the overall PM effectiveness, and also provide an illustration from a newspaper publishing environment to explain the use of the approach. We have developed four heuristic algorithms to yield good solutions to large scale versions of this scheduling problem. The heuristics perform extremely well, and the best heuristic solution is within 1.4% of optimality on an average.
불러오는 중…
- Preventive Maintenance Scheduling by Mathematical Programming
- Scheduling Maintenance and Determining Crew Size for Stochastically Failing Equipment
- Improving Productivity by Periodic Performance Evaluation: A Bayesian Stochastic Model
- Maximization of Labor Productivity Through Optimal Rest-Break Schedules
- Condition-Based Production for Stochastically Deteriorating Systems: Optimal Policies and Learning
- Optimal Maintenance Policy and Sale Date of a Machine
- Characteristics of Optimal Maintenance Policies
- Analytical Solution to a Partially Observable Machine Maintenance Problem with Obvious Failures
- Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
- A Dynamic Model for the Optimal Loading of Linear Multi-Operation Shops
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- Maintenance Policies for Stochastically Failing Equipment: A Survey
- Warnings of Malfunction: The Decision to Inspect and Maintain Production Processes on Schedule or on Demand
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 43(6) · 827–840
- 토픽Reliability and Maintenance Optimization · Safety, Risk, Reliability and Quality
- DOI10.1287/mnsc.43.6.827
- 저자Mohan Gopalakrishnan, Sanjay Laxman Ahire, David M. Miller