Scheduling Maintenance and Determining Crew Size for Stochastically Failing Equipment
Management Science
- 주제설비 유지보수 최적화 · 생산·최적화
Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper develops a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies. For the multi-machine maintenance problem, the sharing of the maintenance-repair crew creates a queuing system. Because of its complexity, an analytical solution of this multi-machine maintenance queuing system is not feasible. A simulation model was used to develop a set of general rules for scheduling maintenance for the multi-machine case.
불러오는 중…
불러오는 중…
불러오는 중…
불러오는 중…
- 저널Management Science · 13(2) · B–52
- 토픽Reliability and Maintenance Optimization · Safety, Risk, Reliability and Quality
- DOI10.1287/mnsc.13.2.b52
- 저자Roger C. Vergin