Communications to the Editor—A Stochastic Bottleneck Assignment Problem
Management Science
8
피인용
1.2
FWCI
0
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Consider an n-job stochastic bottleneck assignment problem in which the production rates are independent random variables rather than constants. Assume that the production rate, R ij , (R ij ≧ 0; i, j = 1, 2, …, n) of man i when assigned to job j is: (1) exponentially distributed with mean 1/λ ij or (2) Weibull distributed with scale parameter λ ij and shape parameter β. It is shown that in either case, the assignment that maximizes the expected rate of the entire line is found by solving the deterministic assignment problem with “cost” matrix [λ ij ].