01Abstract
This paper considers a “single bottleneck system”: a multistage production system where all setups except one are zero. The stage with nonzero setup is defined to be the bottleneck; it may be thought of as the critical resource whose throughput largely determines the throughput of the entire system, as a envisioned by the OPT philosophy. Production is in lots with uncertain (binomial) yields and demand needs to be satisfied in full, thus possibly necessitating multiple production runs. We show how the optimal control problem can be reduced to that of optimal lotsizing a single stage.
02연구 흐름
불러오는 중…
03비슷한 논문
- Multistage Production to Order with Rework Capability
- Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities
- Optimal Operating Policy for a Bottleneck with Random Rework
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- Note: Optimal Policies for Serial Inventory Systems Under Fill Rate Constraints
- A By-Product Production System with an Alternative
- Analysis of a Production/Inventory System Subject to Random Disruptions
- Dynamic Scheduling of a Production/Inventory System with By-Products and Random Yield
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- The Impact of Uncertainty on a Production Line
04이후 연구
05선행 연구
- The Optimum Reject Allowance Problem
- Markovian Decision Models for Reject Allowance Problems
- Dynamic Programming and Systems of Uncertain Duration
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 39(5) · 650–653
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.39.5.650
- 저자Abraham Grosfeld‐Nir