- 주제생산 계획과 일정 · 생산·최적화
Considerable attention in recent years has been devoted to the problem of meeting known demands or requirements over some finite number of planning periods at minimum cost. Representative of these problems is a problem that was first solved in the fundamental paper by Modigliani and Hohn [Modigliani, F., F. E. Hohn. 1955. Production planning over time and the nature of the expectation and planning horizon. Econometrica 23 46–66.] (referred to as M-H). No new solutions to this problem are presented in this note. Rather the procedure is to utilize the results of the M-H paper and to investigate the behavior of the decision rule through time in a very special case which seems to be of considerable practical importance.
불러오는 중…
- An Extension to Modigliani and Hohn's Planning Horizons Results
- Future Capacity Procurements Under Unknown Demand and Increasing Costs
- A Periodic Review, Production Planning Model with Uncertain Capacity and Uncertain Demand—Optimality of Extended Myopic Policies
- A Note on the Modigliani-Hohn Production Smoothing Model
- Further Results on Planning Horizons in the Production Smoothing Problem
- Dynamic Multi-product Procurement With Joint and Individual Setup Costs: Theory and Insights
- Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
- Optimality of Myopic Inventory Policies for Several Substitute Products
- Optimality of Myopic Inventory Policies for Certain Dependent Demand Processes
- Planning Horizons for Production Smoothing with Deterministic Demands
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 저널Management Science · 5(2) · 204–209
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.5.2.204
- 저자Edwin S. Mills