IS Atlas
ms·1973년 4월 1일

Multistage Production for Stochastic Seasonal Demand

Wallace B. Crowston, Warren H. Hausman, William R. Kampe

Management Science

36
피인용
1.2
FWCI
4
IS/마케팅/OM 탑저널 피인용
6
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We consider the problem of production planning for a seasonal good which is produced in a multistage manner (e.g., when one or more components must be produced or purchased with a lead time that is long compared to the sales season). During the selling season, lost Bales occur if demand cannot be satisfied; at the end of the season, leftover inventory incurs the usual overage cost. As the season progresses, the forecast of total demand is revised in light of current sales. The problem is to determine production quantities of the various components and assemblies at each period to minimize expected costs of underage and overage. If delivery is not required until the end of the selling (or “order-taking”) season, then a dynamic programming formulation can produce the optimal decision rule. However, for the case in which delivery is required during the season, the associated dynamic programming formulation is computationally infeasible. The paper explores four heuristics for the latter problem and compares their cost performance in a numerical example. The most sophisticated heuristic produces expected profits which range from 3.2% to 5.5% of an upper bound on expected profit.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보