- 주제생산 계획과 일정 · 생산·최적화
The impact of poor production and inventory planning can be significant in any manufacturing firm. On an aggregate level, excessive inventories can lead to poor cash flows necessitating financing to cover operational costs while stock outs can lead to customer service problems and the eventual loss of business. Therefore managers must utilize their aggregate resources effectively while optimizing individual item run quantities on a daily operational level. This paper presents an analytic framework for a hierarchical treatment of a multi-stage linear programming production and inventory problem. The paper is an extension of the single stage case by the author. The problem we address is multi-item, capacitated, and linear. We require certain cost assumptions: monotone costs to determine an optimal aggregate plan and to establish planning horizons, and separability of costs to optimally disaggregate aggregate production. The hierarchical procedure not only makes business and organizational sense, but is also analytically feasible, computationally attractive, and reduces detailed forecasting requirements. The intent of the paper is twofold: first to present an alternative to the classical single monolithic model for the manager and analyst and second, to provide, for the researcher, a basis for a potentially fruitful area of research in hierarchical planning.
불러오는 중…
- Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- A Coordinated Production Planning Model with Capacity Expansion and Inventory Management
- Multistage Production for Stochastic Seasonal Demand
- A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs
- Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities
- Ordering and Production Decisions with Supply Quality and Demand Uncertainty
- Using Linear Programming to Derive Planning Horizons for a Production Smoothing Problem
- Multi-Echelon Production Scheduling When Demand is Stochastic
- A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- A Mathematical Programming Approach to a Deterministic Kanban System
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- A Facilities in Series Inventory Model with Nested Schedules
- A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 25(11) · 1138–1148
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.25.11.1138
- 저자Henry Gabbay