IS Atlas
pom·2014년 9월 30일·주제 밖

Concerning Workload Control and Order Release: The Pre‐Shop Pool Sequencing Decision

Matthias Thürer, Martin Land, Mark Stevenson, Lawrence D. Fredendall, Moacir Godinho Filho

Production and Operations Management

58
피인용
11.9
FWCI
3
IS/마케팅/OM 탑저널 피인용
37
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Every production planning concept that incorporates controlled order release will initially withhold jobs from the shop floor and create a pre‐shop pool. Order release is a key component of the Workload Control concept that aims to maintain work‐in‐process within limits while ensuring due dates are met. Order release includes two decisions: (i) a sequencing decision that establishes the order in which jobs are considered for release; and, (ii) a selection decision that determines the criteria for choosing jobs for release. While selection has received much research attention, sequencing has been largely neglected. Using simulation, this study uncovers the potential for performance improvement in the sequencing decision and improves our understanding of how order release methods should be designed. Although most prior studies apply time‐oriented sequencing rules and load‐oriented selection rules, analysis reveals that load balancing considerations should also be incorporated in the sequencing decision. But an exclusive focus on load balancing is shown to increase mean tardiness and, paradoxically, require high workloads. A new sequencing rule is developed that only balances loads when multiple orders become urgent. It avoids high mean tardiness and allows the shop to operate at a low workload level. At the same time, the percentage tardy is reduced by up to 50% compared to a purely time‐oriented rule. The findings have implications not only for Workload Control but for any concept that features order release control, such as ConWIP and Drum‐Buffer‐Rope.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보