Managing Electricity Peak Loads in Make‐To‐Stock Manufacturing Lines
Production and Operations Management
인용
- 주제생산 계획과 일정 · 생산·최적화
In this article, we study the control of stochastic make‐to‐stock manufacturing lines in the presence of electricity costs. Electricity costs are difficult to manage because unit costs increase with the total load, that is, the amount of electricity needed by the manufacturing line at a certain point in time. We demonstrate that standard methods for controlling manufacturing lines cannot be used and that standard analytic results for stochastic manufacturing lines do not hold in the presence of electricity costs. We develop a control policy that balances electricity costs with inventory holding and backorder costs. We derive closed‐form expressions and analytic properties of the expected total cost for manufacturing lines with two workstations and demonstrate the accuracy and robustness of the policy for manufacturing lines with more than two workstations. The results indicate that avoiding electricity peak loads requires additional investment in manufacturing capacity and higher inventory and backorder costs. Our approach also applies to companies which aim at reducing their carbon emissions in addition to their operating costs.
불러오는 중…
초록이 없어 비슷한 논문을 찾지 못했습니다
- Sustainable Electric Vehicle Charging using Adaptive Pricing
- Why Have Voluntary Time‐of‐Use Tariffs Fallen Short in the Residential Sector?
- Optimal Capacity Rationing Policy for a Container Leasing System with Multiple Kinds of Customers and Substitutable Containers
- Integrated production and renewable energy generation in the presence of hydrogen energy storage
15 / 49편
- Technology Choice and Capacity Portfolios under Emissions Regulation
- Production and Inventory Control of a Single Product Assemble-to-Order System with Multiple Customer Classes
- Setting Base Stock Levels Using Product-Form Queueing Networks
- Inventory Rationing for Multiple Class Demand under Continuous Review
- Concerning Workload Control and Order Release: The Pre‐Shop Pool Sequencing Decision
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Production and Operations Management · 25(10) · 1709–1726
- 토픽Energy Efficiency and Management · Renewable Energy, Sustainability and the Environment
- DOI10.1111/poms.12570
- 저자Felix Papier