A Constrained Capital Budgeting Problem with Applications to Repair Kit Selection
John W. Mamer, Andrew W. Shogan
인용
- 주제불확실성하 투자 · 생산·최적화
We consider a capital budgeting problem in which each potential project requires the performance of a known set of activities. In general, these sets of activities are not mutually exclusive. However, when a particular activity is common to the requirements of multiple projects, a single performance of the activity simultaneously satisfies the requirements of the multiple projects. Associated with the performance of each activity are two quantities: a known fixed cost and a consumption of a known amount of a scarce resource. Because the sets of activities required by the projects are not mutually exclusive, we cannot apportion an activity's fixed cost or resource consumption to a single project. In this paper, we formulate this capital budgeting problem (and a slight variant) as a maximal network flow problem with a side constraint, and we report computational experience using Lagrangian relaxation to find an optimal solution. We also discuss an application to the selection of parts and tools to include in a field repair kit used to fix a variety of types of breakdowns.
불러오는 중…
- Optimizing Field Repair Kits Based on Job Completion Rate
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
- Capital Budgeting of Interrelated Projects: Survey and Synthesis
- Bottleneck Resource Allocation in Manufacturing
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines
- Note—Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items
- Note—Capital Budgeting of Interdependent Projects: Activity Analysis Approach
- Discrete Dynamic Programming and Capital Allocation
- A Multi-Item Maintenance Center Inventory Model for Low-Demand Reparable Items
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- A Selection Problem of Shared Fixed Costs and Network Flows
- Notes—On a Selection Problem
- Optimizing Field Repair Kits Based on Job Completion Rate
- Note—A Multiple-Item Inventory Model with a Job Completion Criterion
- Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines
- Note—On “Optimizing Field Repair Kits Based on Job Completion Rate”
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 33(6) · 800–806
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.33.6.800
- 저자John W. Mamer, Andrew W. Shogan