An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
Edward Davis, George E. Heidorn
Management Science
167
피인용
26.4
FWCI
8
IS/마케팅/OM 탑저널 피인용
5
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
An algorithm is described which permits the computation of optimal (minimum-duration) solutions for the resource-constrained project network scheduling problem under conditions of multiple resource requirements per job (activity). The approach is a form of bounded enumeration and employs techniques originally developed for the solution of the assembly line balancing problem. Initial computational results are given, along with an example of the type problems solved. Among the advantages of the procedure are that resource requirements can vary over job duration, and various assumptions concerning job continuity are allowable, with no extra computational effort.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 17(12) · B–803
- 토픽Assembly Line Balancing Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.17.12.b803
- 저자Edward Davis, George E. Heidorn