13
피인용
1.9
FWCI
0
IS/마케팅/OM 탑저널 피인용
4
IS/마케팅/OM 탑저널 참고문헌
- 주제네트워크 흐름 최적화 · 생산·최적화
01Abstract
This note addresses a problem of assigning human operators to operations in a manufacturing system. The problem involves a set of operations, a work load for each operation, and a set of human operators, each skilled at a subset of the operations. The task is to assign the operators to the operations so as to maximize the capacity of the system, robustly. The problem is formulated as a network flow problem with a lexicographic objective. It is then shown how to solve this problem very efficiently as a parametric sequence of network maximum flow problems, by application of the “parametric preflow” algorithm of Gallo, Grigoriadis and Tarjan.
02연구 흐름
불러오는 중…
03비슷한 논문
- Parallel Line Assignment Problems
- A Note on Parametric Network Flows
- Flow Management in Flexible Manufacturing Cells with Pipeline Operations
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- The Discrete Resource Allocation Problem in Flow Lines
- Batching to Minimize Flow Times on One Machine
- The Labor Assignment Decision and Application of Work Flow Structure Information
- Increasing the Capacity of a Network: The Parametric Budget Problem
- An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem
- A Min Cost Flow Solution for Dynamic Assignment Problems in Networks with Storage Devices
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 38(9) · 1354–1359
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.38.9.1354
- 저자Robert J. Wittrock