IS Atlas
ms·1986년 3월 1일

Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques

Awi Federgruen, H. Groenevelt

Management Science

인용
102
피인용
6.7
FWCI
0
IS/마케팅/OM 탑저널 피인용
21
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We consider the problem of scheduling n jobs, each with a specific processing requirement, release time and due date on m uniform parallel machines. It is shown that a feasible schedule can be obtained by determining the maximum flow in a network, thus permitting the use of standard network flow codes. Using a specialized maximum flow procedure, the complexity reduces to O(tn3) operations when t is the number of distinct machine types. Previous algorithms solve the feasibility problem in O((m + log n)(m2n3 + n4)) operations. In addition to the feasibility problem, we describe algorithms for the maximum lateness criterion. Here we develop a bound which compares even more favorably to the best previous bound. We also show how other criteria with respect to the amount of work completed on each job prior to its due date or the amount of work scheduled in each of a sequence of periods can be optimized by similar path augmenting techniques.

02연구 흐름

불러오는 중…

03비슷한 논문
04이후 연구

아직 이 논문을 인용한 탑저널 논문이 없습니다.

05선행 연구

15 / 21편

06서지 정보