IS Atlas
ms·1984년 3월 1일

Age Replacement Under Alternative Cost Criteria

Jake Ansell, A. Bendell, Steve Humble

Management Science

36
피인용
2.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
13
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Due to the complexity of optimum replacement problems over finite lime horizons various asymptotic criteria based upon fixed age replacement policies have been employed in the literature and in practice. In this paper the relationships between the optimum policies under three alternative cost criteria are considered. An ordering of the accounting costs under two of these is obtained, and for distributions with Increasing Hazard Rate an ordering of the optimum replacement time is derived. For a finite time horizon the policies are compared to the optimal sequential and fixed-age replacement polices through the example of a gamma distribution previously investigated by Barlow and Proschan (Barlow, R. E., F. Proschan. 1962. Planned replacement. K. J. Arrow, S. Karlin, W. L. Smith, eds. Studies in Applied Probability and Management Science. Stanford University Press, Stanford, Cal.; Barlow, R. E., F. Proschan. 1965. Mathematical Theory of Reliability. Wiley, New York.).

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보