IS Atlas
ms·1969년 11월 1일

Probability Bounds in Replacement Policies for Markov Systems

Avraham Beja

Management Science

10
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
8
IS/마케팅/OM 탑저널 참고문헌
01Abstract

The precise costs of operating a stationary finite Markov system are assumed undefined. It is only known that the cost of failure is orders of magnitude higher than the cost of replacement, and that all other costs are relatively negligible. The problem considered is the maximisation of the expected length of time between replacements subject to bounds on the average hazard throughout the remaining part of the replacement cycle whenever the system is not replaced. The solution is shown to be a unique pure strategy, and a computation algorithm is presented which constitutes an extension of Howard's policy iteration principle to considerations of feasibility. A sensitivity analysis indicates the range of the cost parameters under which the same solution would be optimal for a standard minimum-cost problem. The two approaches thus appear to be essentially equivalent.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보