Optimal System Allocations with Penalty Costs
Cyrus Derman, G. J. Lieberman, Sheldon M. Ross
인용
- 주제설비 유지보수 최적화 · 생산·최적화
We have N stages to sequentially construct I successful components. At each stage, we allocate a certain amount of money for the construction of a component. If y is the amount allocated, then the component constructed will be a success with probability P(y), where P is a continuous nondecreasing function satisfying P(0) = 0. After each component is constructed, we are informed as to whether or not it is successful. If, at the end of the N stages, we are i components short, then a final penalty cost C(i) is incurred. The problem is to determine at each stage how much money to allocate so as to minimize the total expected cost (construction cost plus penalty cost) incurred. The major result is that if C(i + 1) − C(i) ≤ C(i + 2) − C(i + 1), and if yn(i) denotes the optimal value to allocate when i components are needed with n stages remaining, then yn(i) is nondecreasing in i and nonincreasing in n.
불러오는 중…
- Optimal Allocations in the Construction of <i>k</i>-Out-of-<i>n</i> Reliability Systems
- Investment in Series and Parallel Systems to Maximize Expected Life
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- Costs of Incorrect Data in Optimal Inventory Computations
- Economic Lot Size Determination in Multi-Stage Assembly Systems
- Optimal Repairman Allocation—Asymptotic Results
- A Renewal Decision Problem
- Optimal Screening Plans for Nonserial Production Systems
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 저널Management Science · 23(4) · 399–403
- 토픽Capital Investment and Risk Analysis · Finance
- DOI10.1287/mnsc.23.4.399
- 저자Cyrus Derman, G. J. Lieberman, Sheldon M. Ross