Optimal System Allocations with Penalty Costs

Cyrus Derman, G. J. Lieberman, Sheldon M. Ross

Management Science

17
피인용
1.2
FWCI
0
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We have N stages to sequentially construct I successful components. At each stage, we allocate a certain amount of money for the construction of a component. If y is the amount allocated, then the component constructed will be a success with probability P(y), where P is a continuous nondecreasing function satisfying P(0) = 0. After each component is constructed, we are informed as to whether or not it is successful. If, at the end of the N stages, we are i components short, then a final penalty cost C(i) is incurred. The problem is to determine at each stage how much money to allocate so as to minimize the total expected cost (construction cost plus penalty cost) incurred. The major result is that if C(i + 1) − C(i) ≤ C(i + 2) − C(i + 1), and if y n (i) denotes the optimal value to allocate when i components are needed with n stages remaining, then y n (i) is nondecreasing in i and nonincreasing in n.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보