- 주제생산 계획과 일정 · 생산·최적화
Scheduling of multistage serial production systems under constant demand and infinite horizon is considered. The production stages operate with periodic shut-downs and startups. An integer nonlinear programming formulation is presented for determining a stationary, cyclic schedule with no stock-outs in any inventory and minimum sum of set-up and inventory costs. It allows a lot-sizing policy involving arbitrary, noninteger splitting/merging of lots. Three, almost optimal, heuristic algorithms and an exact branch and bound algorithm are developed using analytical results. Their evaluation using simulated problems shows the branch and bound algorithm to be the best, as it is fast even for systems with as many as 11 stages.
불러오는 중…
- Optimal Inventory Policy with Multiple Set-Up Costs
- A Multiproduct Inventory System with Interactive Set-Up Costs
- Single-Stage Approximations for Optimal Policies in Serial Inventory Systems with Nonstationary Demand
- Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities
- Inventory Control with Multiple Setup Costs
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- An Algorithm for Optimal Inventory Policies For Systems with Joint Setup Costs
- Optimal Leadtimes Planning in a Serial Production System
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems
- Economic Lot Size Determination in Multi-Stage Assembly Systems
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- Note—Comments on the Optimality in “Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems”
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 38(10) · 1467–1481
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.38.10.1467
- 저자Iftekhar A. Karimi