Optimal Leadtimes Planning in a Serial Production System
Linguo Gong, A.G. de Kok, Jie Ding
인용
- 주제생산 계획과 일정 · 생산·최적화
Consider an N stage serial production line where the processing times of orders may be random. Since the carrying costs increase from stage to stage, the standard production procedure, that is, to determine a total leadtime for the entire order by taking an appropriate percentile of the distribution of total processing time and then release the order immediately from stage to stage during the process, may not be optimal since it ignores inventory carrying costs. This article studies a per stage planned leadtime dispatching policy for such systems. The order will not be released immediately to the next workstation prior to a predetermined delivery time, or planned leadtime. The vector of planned leadtimes at workstations is to be determined by trading off expected holding costs at all stages and expected penalty costs for exceeding the total planned leadtime. We show that the optimal vector of planned leadtimes may be obtained efficiently by solving an equivalent serial inventory model of the type considered in Clark and Scarf (1960).
불러오는 중…
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems
- Inventory Control when the Lead‐time Changes
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- Order-Level Inventory Systems with Independent Stochastic Leadtimes
- Optimal Expediting Policies for a Serial Inventory System with Stochastic Lead Time
- Optimization of (s, S) Inventory Systems with Random Lead Times and a Service Level Constraint
- Note: Optimal Policies for Serial Inventory Systems Under Fill Rate Constraints
- A Dynamic Inventory Model with Stochastic Lead Times
- Quoting Customer Lead Times
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 40(5) · 629–632
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.40.5.629
- 저자Linguo Gong, A.G. de Kok, Jie Ding