Scheduling Workforce and Workflow in a High Volume Factory
Oded Berman, Richard Charles Larson, Edieal J. Pinker
인용
- 주제작업장 일정 최적화 · 생산·최적화
We define a high volume factory to be a connected network of workstations, at which assigned workers process work-in-progress that flows at high rates through the workstations. A high rate usually implies that each worker processes many pieces per hour, enough so that work can be described as a deterministic hourly flow rate rather than, say, a stochastic number of discrete entities. Examples include mail processing and sorting, check processing, telephoned order processing, and inspecting and packaging of certain foods. Exogenous work may enter the factory at any workstation according to any time-of-day profile. Work-in-progress flows through the factory in discrete time according to Markovian routings. Workers, who in general are cross-trained, may work part time or full time shifts, may start work only at designated shift starting times, and may change job assignments at mid shift. In order to smooth the flow of work-in-progress through the service factory, work-in-progress may be temporarily inventoried (in buffers) at work stations. The objective is to schedule the workers (and correspondingly, the workflow) in a manner that minimizes labor costs subject to a variety of service-level, contractual and physical constraints. Motivated in part by analysis techniques of discrete time linear time-invariant (LTI) systems, an object-oriented linear programming (OOLP) model is developed. Using exogenous input work profiles typical of large U.S. mail processing facilities, illustrative computational results are included.
불러오는 중…
- The Labor Assignment Decision and Application of Work Flow Structure Information
- Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost
- Even-Flow, A Scheduling Method for Reducing Lateness in Job Shops
- Modeling of Workflow Congestion and Optimization of Flow Routing in a Manufacturing/Warehouse Facility
- Work Flow Structure: An Analysis for Planning and Control
- Focused Scheduling in Proportionate Flowshops
- Flow Management in Flexible Manufacturing Cells with Pipeline Operations
- Dynamic Scheduling of a Production/Inventory System with By-Products and Random Yield
- Design for Synchronized Flow Manufacturing
- Optimizing Processing Rates for Flexible Manufacturing Systems
- Discretionary Task Ordering: Queue Management in Radiological Services
- Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers
- Structural Flexibility: A New Perspective on the Design of Manufacturing and Service Operations
- The Impact of Schedule Consistency on Shift Worker Productivity: An Empirical Investigation
- Service Completion Estimates for Cross‐trained Workforce Schedules under Uncertain Attendance and Demand
- Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling
- The Performance Effects of Giving Front-Line Employees Direct Access to Performance Data and Thereby Limiting the Supervisor’s Feedback-Intermediation Role: Evidence from a Field Experiment
- Workforce Configuration in Charity Settings: A Forward-Looking Approach
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
- 저널Management Science · 43(2) · 158–172
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.43.2.158
- 저자Oded Berman, Richard Charles Larson, Edieal J. Pinker