Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling
Michael J. Brusco, Larry W. Jacobs
인용
- 주제작업장 일정 최적화 · 생산·최적화
This paper presents a compact integer-programming model for large-scale continuous tour scheduling problems that incorporate meal-break window, start-time band, and start-time interval policies. For practical scheduling environments, generalized set-covering formulations (GSCFs) of such problems often contain hundreds of millions of integer decision variables, usually precluding identification of optimal solutions. As an alternative, we present an implicit integer-programming model that frequently has fewer than 1,500 variables and can be formulated and solved using PC-based hardware and software platforms. An empirical study using labor-requirement distributions for customer service representatives at a Motorola, Inc. call center was used to demonstrate the importance of having a model that can evaluate tradeoffs among the various scheduling policies.
불러오는 중…
- Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
- Overlapping Start-Time Bands in Implicit Tour Scheduling
- Optimal Shift Scheduling with Multiple Break Windows
- Improved Implicit Optimal Modeling of the Labor Shift Scheduling Problem
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Solving Large-Scale Tour Scheduling Problems
- Maximization of Labor Productivity Through Optimal Rest-Break Schedules
- Sufficient Working Subsets for the Tour Scheduling Problem
- Grammar-Based Integer Programming Models for Multiactivity Shift Scheduling
- Lot-Sizing with Start-Up Times
아직 이 논문을 인용한 탑저널 논문이 없습니다.
15 / 31편
- Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
- Scheduling Workforce and Workflow in a High Volume Factory
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Improved Implicit Optimal Modeling of the Labor Shift Scheduling Problem
- Work Force Size and Single Shift Schedules with Variable Demands
- Solving Large-Scale Tour Scheduling Problems
- Personnel Tour Scheduling When Starting-Time Restrictions Are Present
- Solving Airline Crew Scheduling Problems by Branch-and-Cut
- Overlapping Start-Time Bands in Implicit Tour Scheduling
- Flight Crew Scheduling
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 46(12) · 1630–1641
- 토픽Scheduling and Timetabling Solutions · Management Science and Operations Research
- DOI10.1287/mnsc.46.12.1630.12074
- 저자Michael J. Brusco, Larry W. Jacobs