01Abstract
The time adjusted minimum average costs of an industrial equipment or process are expressed in terms of the logarithmic decrement of its salvage values. The obsolescence gradient and/or the economic life of the equipment do not enter into the formula of the minimum average costs, which are thus obtained more simply and accurately than through the classical estimation procedures.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 6(1) · 111–122
- 토픽Technology Assessment and Management · Safety, Risk, Reliability and Quality
- DOI10.1287/mnsc.6.1.111
- 저자Francois J. Olmer