IS Atlas
ms·1969년 1월 1일

Shortest Route Models for the Allocation of Inspection Effort on a Production Line

Leon S. White

Management Science

74
피인용
0.0
FWCI
4
IS/마케팅/OM 탑저널 피인용
11
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Two shortest route models for determining where to allocate inspection effort on a production line are developed for the cases where this effort is unlimited or limited in its availability. A production line is defined as an ordered sequence of production stages, each stage consisting of a manufacturing operation followed by a potential inspection station. Items flow through the line in batches and may incur defects at any stage. Defects are assumed to be repairable or non-repairable. The defect generating process at any stage is taken to be an independent Bernoulli process with a known parameter. Two levels of inspection effort may be applied at any stage: no inspection or 100% inspection. Thus, both models are used to determine the stages at which batches are to be 100% inspected. A general cost structure is postulated first for the case where items with repairable defects are immediately repaired and items with non-repairable defects are discarded, and then for the case where all items found to be defective are replaced immediately with non-defectives. An expected cost per batch criterion is used to determine an optimal inspection plan in all cases. Examples are included.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보