- 주제생산 계획과 일정 · 생산·최적화
Models in which process quality and lot sizing interact have recently been developed. Lot sizes should be reduced to compensate for poor quality if no effective inspection is possible. This note introduces an inspection delay time, measured in units produced after an inspection is made until results are known. If the inspection delay is negligible, then the problem reduces essentially to two separate lot sizing problems: the classical EOQ lot sizing problem and an inspection lot sizing problem. If the delay is great, then only one inspection should be made and the lot size is as given by Porteus, and Rosenblatt and Lee. This note seeks the optimal production and inspection lot sizes for the full spectrum of inspection delays. The impact of the results is illustrated numerically. The value of automated defect control (with 100% inspection and immediate production stoppage upon detection of a defect) is discussed.
불러오는 중…
- Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
- The Impact of Inspector Fallibility on the Inspection Policy in Serial Production Systems
- Lot Sizes, Lead Times and In-Process Inventories
- Note—Lot-Sizing and Sequencing Delays
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Production Lot Sizing with Machine Breakdowns
- Shortest Route Models for the Allocation of Inspection Effort on a Production Line
- Effects of Learning on Optimal Lot Size
- The Joint Effect of Leadtime Variance and Lot Size in a Parallel Processing Environment
- Imperfect Inspection in a Multistage Production Process
- Pushing Quality Improvement Along Supply Chains
- Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
- Competitive and Collaborative Quality and Warranty Management in Supply Chains
- Opportunities for Improved Statistical Process Control
- Optimal Parallel Inspection for Finding the First Nonconforming Unit in a Batch—An Information Theoretic Approach
- Requirement or Promise? An Analysis of the First‐Mover Advantage in Quality Contracting
- Measuring the Impact of a Delay Buffer on Quality Costs with an Unreliable Production Process
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 36(8) · 999–1007
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.36.8.999
- 저자Evan L. Porteus