IS Atlas
ms·1997년 9월 1일

Inspection for Circuit Board Assembly

Philippe Chévalier, Lawrence M. Wein

Management Science

25
피인용
3.5
FWCI
2
IS/마케팅/OM 탑저널 피인용
9
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Several stages of tests are typically performed in circuit board assembly, and each test consists of one or more noisy measurements. We consider the problem of jointly optimizing the allocation of inspection and the testing policy in a system with a predefined inspection configuration; that is, at which stages should a board be inspected, and at these stages, whether to accept or reject a board based on noisy test measurements. The objective is to minimize the expected costs for testing, repair, and defective items shipped to customers. We analyze the problem and document an application of the model to an industrial facility. Since we were unable to gather all the necessary data, the model was applied in a limited and piecemeal fashion. Nevertheless, the proposed policy significantly improves upon the facility's historical policy.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보