34
피인용
2.9
FWCI
1
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
A description of the blast furnace production process is presented and the thermochemical metallurigcal process is expressed as a set of constraints of a linear programming problem. The solution indicates a minimum cost selection of input materials in a production planning context. The material presented here is dedicated to those who are engaged in the mathematical modelling of chemical and other complex processes for purposes of management control. It is also hoped that by adding the paper to the literature of detailed examples, a case study, often desired for classroom instruction, will be provided to educators.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Linear Programming Model of Integrated Iron and Steel Production
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- A Mathematical Programming Approach to Schedule Master Slab Casters in the Steel Industry
- A Linear Programming Approach to Production and Employment Scheduling
- Implicit Treatment of “Zero or Range” Constraints in a Model for Minimum Cost Foundry Alloys
- The Implementation of Process Models
- Production Planning in Assembly Line Systems
- A Production Scheduling Model by Bivalent Linear Programming
- Production and Sales Planning with Limited Shared Tooling at the Key Operation
- Using Linear Programming to Derive Planning Horizons for a Production Smoothing Problem
04이후 연구
05선행 연구
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 14(2) · B–1
- 토픽Iron and Steelmaking Processes · Mechanical Engineering
- DOI10.1287/mnsc.14.2.b1
- 저자T Fábián