Integrated steel mills usually have a choice over the use of various materials and production processes. Different ores may be used in the production of iron; steel scrap and iron can be used in different proportions in the production of steel. The economical usage rate of all materials is a function of numerous variables, among which the market price of some materials, notably of various grades of steel scrap, fluctuates and therefore requires a periodic determination of the economical usage rate. This is a typical problem for programming. The paper presents a mathematical formulation of the stages of iron and steel production to determine the optimal (least cost) rate of input of materials. The models of the various stages of production are connected to form a “master model” of an integrated steel mill.
불러오는 중…
- A Process Analysis Model of the U.S. Steel Industry
- Blast Furnace Production Planning—A Linear Programming Example
- The Pit Charging Problem in Steel Production
- A Mathematical Programming Approach to Schedule Master Slab Casters in the Steel Industry
- Implicit Treatment of “Zero or Range” Constraints in a Model for Minimum Cost Foundry Alloys
- A Linear Programming Analysis of Paper Recycling
- Integrated Sequencing and Scheduling in Coil Coating
- Optimal Capacities of Production Facilities
- Ordering and Production Decisions with Supply Quality and Demand Uncertainty
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
- 저널Management Science · 4(4) · 415–449
- 토픽Iron and Steelmaking Processes · Mechanical Engineering
- DOI10.1287/mnsc.4.4.415
- 저자T Fábián