01Abstract
In this paper, we study a class of the capacitated dynamic lot size problem, where, over time, the setup costs are nonincreasing, the unit holding costs have arbitrary pattern, the unit production costs are nonincreasing and the capacities are nondecreasing. We investigate the properties of the optimal solution for the problem and develop the concept of candidate subplan. It is proven that only the candidate subplans need to be examined in searching for an optimal solution. A dynamic programming algorithm, incorporating the concept of candidate subplan, is then devised which has run time complexity of O(T2).
02연구 흐름
불러오는 중…
03비슷한 논문
- An <i>O</i>(<i>T</i><sup>3</sup>) Algorithm for the Economic Lot-Sizing Problem with Constant Capacities
- An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- Computational Complexity of the Capacitated Lot Size Problem
- Capacitated Lot Sizing with Setup Times
- A Dynamic Lot-Size Model with Make-or-Buy Decisions
- The Capacitated Lot-Sizing Problem with Linked Lot Sizes
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- Lot Sizing and Sequencing for <i>N</i> Products on One Facility
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
04이후 연구
- An O(T3) Algorithm for the Economic Lot-Sizing Problem with Constant Capacities
- An Algorithm for Single-Item Capacitated Economic Lot Sizing with Piecewise Linear Production Costs and General Holding Costs
- Integrated Lot Sizing in Serial Supply Chains with Production Capacities
- A Dynamic Lot-Sizing Model with Demand Time Windows
05선행 연구
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- Erratum: Deterministic Production Planning with Concave Costs and Capacity Constraints
- Deterministic Production Planning: Algorithms and Complexity
- Computational Complexity of the Capacitated Lot Size Problem
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- Bounded Production and Inventory Models with Piecewise Concave Costs
- A Class of Deterministic Production Planning Problems
- A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 34(3) · 420–426
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.34.3.420
- 저자Chia‐Shin Chung, Chien-Hua Mike Lin