- 주제생산 계획과 일정 · 생산·최적화
This research focuses on the effect of setup time on lot sizing. The setting is the Capacitated Lot Sizing Problem (the single-machine lot sizing problem) with nonstationary costs, demands, and setup times. A Lagrangian relaxation of the capacity constraints of CLSP allows it to be decomposed into a set of uncapacitated single product lot sizing problems. The Lagrangian dual costs are updated by subgradient optimization, and the single-item problems are solved by dynamic programming. A heuristic smoothing procedure constructs feasible solutions (production plans) which do not require overtime. The algorithm solves problems with setup time or setup cost. Problems with extremely tightly binding capacity constraints were much more difficult to solve than anticipated. Solutions without overtime could not always be found for them. The most significant results are that (1) the tightness of the capacity constraint is a good indicator of problem difficulty for problems with setup time; and (2) the algorithm solves larger problems better than smaller problems, although they are more time consuming to solve. This indicates that larger problems may be easier despite the greater computational effort they require.
불러오는 중…
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Computational Complexity of the Capacitated Lot Size Problem
- Lot-Sizing with Start-Up Times
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- The Capacitated Lot-Sizing Problem with Linked Lot Sizes
- Cyclical Schedules for Capacitated Lot Sizing with Dynamic Demands
- Programming of Economic Lot Sizes
- Scheduling Economic Lot Size Production Runs
- Joint Production and Pricing Decisions with Setup Costs and Capacity Constraints
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Ending Inventory Valuation in Multiperiod Production Scheduling
- A Dual Ascent and Column Generation Heuristic for the Discrete Lotsizing and Scheduling Problem with Setup Times
- Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs
- bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems
- A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover
- Lot-Sizing with Start-Up Times
- The Capacitated Lot-Sizing Problem with Linked Lot Sizes
- Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs
- The Dynamic Line Allocation Problem
- Optimal Operating Policy for a Bottleneck with Random Rework
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- Cyclical Schedules for Capacitated Lot Sizing with Dynamic Demands
15 / 24편
- Programming of Economic Lot Sizes
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Strong Formulations for Multi-Item Capacitated Lot Sizing
- Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources
- Optimal Programming of Lot Sizes, Inventories and Labor Allocations—A Comment
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 35(3) · 353–366
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.35.3.353
- 저자William W. Trigeiro, John O. McClain