This paper deals with the lot sizing problem in which the key features of imperfections in a production process are explicitly modelled. These features include: process shifting to out-of-control states, detection of the out-of-control shifts, corrective actions following the detections, and the fixed setup and variable processing times of reworks. The problem is motivated by the wafer probe operation in semiconductor manufacturing. The key objective that drives the lot sizing decision is to reduce the total processing time on a critical resource. Such an objective is aimed at reducing the congestion level at this resource.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 38(9) · 1314–1328
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.38.9.1314
- 저자Hau L. Lee