- 주제다목적 최적화 · 생산·최적화
This paper extends previous work on the use of sequential building heuristics for the design of a collection system, a linear fixed-charge problem that includes the design of a lock-box system as an important subproblem. The heuristic extensions in this paper first present simple methods for eliminating “premature termination” (stopping the heuristics while there are still worthwhile alternatives not included in the collection system) and unprofitable inclusion (including collection alternatives with net benefits less than the fixed cost). Initiation procedures that increase computational efficiency and reduce the likelihood of significant suboptimization are presented. Finally, the simple one-at-a-time building procedure is extended to include joint exclusion-building (a limited switching plus building) and combination switching-building rules that consider combinations of alternatives rather than one-at-a-time evaluation.
불러오는 중…
- An Application of Heuristic Problem Solving to Accounts Receivable Management
- Batch Construction Heuristics and Storage Assignment Strategies for Walk/Ride and Pick Systems
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- A Game Theoretic Approach to Collections and Disbursements
- A Simple Heuristic for Joint Inventory and Pricing Models with Lead Time and Backorders
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- Theory and Application of an Optimizing Procedure for Lock Box Location Analysis
- A Sequential Lot Sizing Heuristic with Optimal Average Performance
- Dynamic Credit-Collections Optimization
- Assembly Line Balancing Using Probabilistic Combinations of Heuristics
- Exceptional Paper—Location of Bank Accounts to Optimize Float: An Analytic Study of Exact and Approximate Algorithms
- An Application of Heuristic Problem Solving to Accounts Receivable Management
- A Two Stage Solution Procedure for the Lock Box Location Problem
- A Lock-Box Model
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 27(8) · 866–880
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.27.8.866
- 저자Bernell K. Stone