Improved Heuristics for Multi-Stage Requirements Planning Systems
Joseph D. Blackburn, ROBERT A. MILLEN
인용
- 주제생산 계획과 일정 · 생산·최적화
Most of the recent studies of heuristic lot-sizing techniques for multi-stage material requirements planning systems have investigated the problem in the context of a single stage. In this paper, the multi-stage problem is first modeled analytically to indicate the potential errors inherent in the commonly proposed single-pass, stage-by-stage approaches (e.g., Wagner-Whitin). Then, based on this analysis, several simple cost modifications are suggested to improve the global optimality of these procedures. The effectiveness of these alternative modifications is tested through a series of simulation experiments. It is concluded that some of these modifications consistently improve the performance of the stage-by-stage approaches.
불러오는 중…
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources
- Capacity planning with limited information
- Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes
- Determining Optimal Reorder Intervals in Capacitated Production-Distribution Systems
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory Systems
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- A Facilities in Series Inventory Model with Nested Schedules
- Economic Lot Size Determination in Multi-Stage Assembly Systems
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- Dynamic Lot Size Models for Multi-Stage Assembly Systems
- 탑저널 밖 논문
- 저널Management Science · 28(1) · 44–56
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.28.1.44
- 저자Joseph D. Blackburn, ROBERT A. MILLEN