ms·1980년 11월 1일
Note—On “A New Look at Production Switching Heuristics for the Aggregate Planning Problem”
Management Science
15
피인용
1.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
Several papers have been published which present simplified models for the aggregate planning problem which do not yield optimal schedules. They are typically supported with computations that suggest that the resulting schedules produce costs within a few percent of optimum. This note suggests that those cost comparisons have been made against inappropriate base costs which include a large fixed cost element. When these models are compared using only the controllable variable costs, costs that appeared to be only one or two percent over minimum turn out to be as much as twenty to thirty percent over the costs resulting from optimal solutions.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 26(11) · 1185–1186
- 토픽Optimization and Mathematical Programming · Control and Systems Engineering
- DOI10.1287/mnsc.26.11.1185
- 저자Roger C. Vergin