ms·1976년 11월 1일
Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”
인용
46
피인용
1.7
FWCI
0
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model” [Szendrovits, A. Z. 1975. Manufacturing cycle time determination for a multi-stage economic production quantity model. Management Sci. 22 (3, November) 298–308.].
02연구 흐름
불러오는 중…
03비슷한 논문
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
- Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A Rejoinder
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- A Deterministic Multi-Period Production Scheduling Model with Backlogging
- Communication to the Editor—A Note on Krone's Economic Lot-Size Formulas
- Note—A Comment on “Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- Note—A Note on “A Simple CPM Time-Cost Tradeoff Algorithm”
- An Analytic Congestion Model for Closed Production Systems with IFR Processing Times
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
06서지 정보
- 저널Management Science · 23(3) · 332–333
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.23.3.332
- 저자S.K. Goyal