ms·1981년 2월 1일
Note—Prediction Intervals for Warranty Reserves and Cash Flows
Jayprakash G. Patankar, George H. Worm
Management Science
37
피인용
4.5
FWCI
3
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제설비 유지보수 최적화 · 생산·최적화
01Abstract
This paper presents estimates of cash flows associated with a given warranty policy. Included in the results are prediction intervals for warranty reserves and cash flows. A numerical example is given to illustrate these results.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 27(2) · 237–241
- 토픽Reliability and Maintenance Optimization · Safety, Risk, Reliability and Quality
- DOI10.1287/mnsc.27.2.237
- 저자Jayprakash G. Patankar, George H. Worm